You are here: Home » Engineering Waterproofing » 911 Polyurethane Waterproof Coating

This product is a two-component chemically reactive curing waterproof coating. Component A is a polyurethane prepolymer, and Component B is the curing component. After Components A and B are mixed and stirred evenly according to a certain proportion, the mixture is applied to the construction surface. After curing, it forms an elastic, integrated waterproof membrane.
Product description| PRODUCT DESCRIPTION
This product is a two-component chemically curable waterproof coating. A is a polyurethane prepolymer, B is a cured component, A, B The material is mixed and stirred evenly according to a certain proportion, then applied to the < surface of the application span style="">. After curing, a resilient overall waterproof adhesive film is formed.
Product Features| PRODUCT FEATURES
◆ The coating film has rubber elasticity, good stretchability, and high tensile strength;
◆ Excellent high-temperature resistance and low-temperature flexibility;
◆ Easy to apply thick coating, seamless coating film, strong integrity;
◆ Has certain corrosion resistance.
Scope of Application| SCOPE OF APPLICATION
(1) Various Roof and Bathroom Waterproofing Projects;
(2) Waterproofing of the water-facing surface of underground maintenance structures;
(3) Waterproofing of water-facing surfaces such as basements, swimming pools, civil air defense projects, and storage pools.
Construction Guide| CONSTRUCTION GUIDE
<p style=""><span style=""> <hr style=""><p style=""><span style=""><span style=""> Construction Process
<span style="">(1) <span style=""> The construction surface must be dry, solid, level, free of dust and oil stains, with moisture content <span style=""><8%;
(2) Mix A ingredients and ingredients according to the ratio and thoroughly stir evenly;
(3) This product is usually coated in two coats. The scraping thickness is generally around 1.0mm . After the first coat surface has dried and cured, <span style=""> The second coat can be applied. The scraping direction must be perpendicular to the first coat, ensuring it does not stick to the touch .
Storage, Transportation, and Packaging
Products should be stored sealed in a cool, ventilated, and dry place above 5°C12 months.
Precautions
(1) The mixed material should be used up within 20 minutes;
(2) The construction temperature should preferably be above 5°C, and maintain air circulation during construction;
(3) No need to add diluent when using the product. In special cases, continue dilution, and confirm through a small test that the thinner used does not affect the quality of the coating film

franchise hotline: 199-2599-7013
contact us
Address: Hengdang Industrial Zone, Huangpu Town, Zhongshan City, Guangdong Province
Leasing Hotline: 199-2599-7013
After-sales Hotline:400-830-9488
Customer Service Box: < ah, href="mailto:286239486@qq.com" >286239486@qq.com
company fax: 0760-23977772
LinksAuto Spray EquipmentSpray GunPaint FranchiseWood Paint MakerChina Coatings NetGarment TagsArt Paint FranchiseArt PaintCustom office furnitureOffice furniture manufacturerImported Decorative PaintOffice furnitureImported Decorative PaintOffice furniture brandOffice furniture designSearch External Links
© 2017 Master Ali All rights reserved. ICP: Yue ICP Bei No. 11031542